← All solutions

PETRA / ENGINEERING & MANUFACTURING

OPC UA and industrial software

Industrial data integration between machines and higher-level applications.

OPC UA and industrial software

A solution around your process

Useful production data starts with a well-defined connection between equipment and software. Petra Otomasyon approaches OPC UA and industrial software integration in the context of your existing control architecture.

Variables, data types, update intervals and connection-loss behavior are defined for the project. Authorization, certificates and network boundaries are part of the integration plan.

Share the PLC or OPC UA server details, target application and intended use of the data. Together we can define the scope for monitoring, recording and exchanging production information.

Defining the data model

Read and write variables, data types, timestamps and update intervals are defined first. The decisions or records supported by the data need to be understood before selecting the connection approach.

Connection and application behavior

The OPC UA server, client application, certificates and network boundaries are considered together. Connection loss, retries, record matching and unauthorized writes require explicit project requirements.

Application areas

Production monitoring, recording and system integration. Suitability is assessed against your product, process and operating conditions; this is a scope description, not a completed-project reference.

Testing and handover

Required inspection points, technical checks and delivery documents are defined before implementation. Acceptance depends on agreed requirements rather than unspecified performance assumptions.

Frequently asked questions

What should I share for an initial quotation?

Provide your process description, available drawings or program backups, equipment information, quantity or capacity requirements and target schedule. Missing inputs are clarified during the technical review.

Can you work with our existing equipment?

Existing systems can be evaluated. Compatibility depends on equipment condition, available drawings, software access and the required interfaces. The scope is established after reviewing these inputs.

How are delivery time and acceptance defined?

Timing depends on design scope, component availability, manufacturing needs and site conditions. Acceptance criteria and included documentation should be agreed together with the scope before work starts.