A solution around your process
The electrical control panel provides the physical foundation for a machine’s control system. Petra Otomasyon designs and manufactures panels for industrial applications.
Equipment loads, operating conditions and available space inform the layout. Component access, wiring organization and maintenance needs are considered throughout the design.
Share your electrical drawings, equipment list and panel dimensions where available. Panel manufacturing can be coordinated with PLC programming and HMI development within the same project.
Electrical design and layout
Power and control circuits, equipment lists, cabinet dimensions and operating conditions establish the scope. Component access, cable routing, thermal conditions and maintenance space influence the layout.
Assembly and documentation
Wiring, terminal identification, labels and electrical drawings need to remain consistent. Inspection and handover documentation are defined against the customer specification and application requirements.
Application areas
Machine and facility control panels. Suitability is assessed against your product, process and operating conditions; this is a scope description, not a completed-project reference.
Testing and handover
The operating scenarios, test parts, acceptance criteria and documents are agreed in the project scope. Where required, factory acceptance (FAT) and site acceptance (SAT) can be planned separately, with responsibilities and conditions defined before commissioning.
Frequently asked questions
What should I share for an initial quotation?
Provide your process description, available drawings or program backups, equipment information, quantity or capacity requirements and target schedule. Missing inputs are clarified during the technical review.
Can you work with our existing equipment?
Existing systems can be evaluated. Compatibility depends on equipment condition, available drawings, software access and the required interfaces. The scope is established after reviewing these inputs.
How are delivery time and acceptance defined?
Timing depends on design scope, component availability, manufacturing needs and site conditions. Acceptance criteria and included documentation should be agreed together with the scope before work starts.
